Bubshait, A A and Cunningham, M J (1998) Comparison of Delay Analysis Methodologies. Journal of Construction Engineering and Management, 124(04), 315–22.

Chao, L and Skibniewski, M J (1998) Fuzzy Logic for Evaluating Alternative Construction Technology. Journal of Construction Engineering and Management, 124(04), 297–304.

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1998)124:4(297)
  • Abstract:
    The construction environment is changeable and full of uncertainties, so each alternative work method for an operation may have optimistic and pessimistic cost estimates, along with corresponding probabilities. The cost variability and thus the risk of a new technology is often even greater, which affects the acceptability of the technology. The expected monetary values of technology alternatives do not reflect a decision maker's preference for potential gains or his or her aversion to likely adversities. Formal decision analysis techniques, such as the one based on utility theory, must be employed to model a decision maker's value system. As an alternative to those traditional techniques, this paper presents a fuzzy-logic-based, risk-incorporating approach to evaluating new construction technology, intended to produce consistent technology implementation decisions. Its concepts and steps are described in detail, followed by an example in which alternative methods for the formwork operation of a high-rise building project are evaluated. Experimental results show that the approach can produce a consistent evaluation of the available options, according to a set of user-defined linguistic rules that state the priorities in a given project scenario.

Faniran, O O, Oluwoye, J O and Lenard, D J (1998) Interactions between Construction Planning and Influence Factors. Journal of Construction Engineering and Management, 124(04), 245–56.

Garza, J M d l, Hancher, D E and Decker, L (1998) Analysis of Safety Indicators in Construction. Journal of Construction Engineering and Management, 124(04), 312–4.

Harmelink, D J and Rowings, J E (1998) Linear Scheduling Model: Development of Controlling Activity Path. Journal of Construction Engineering and Management, 124(04), 263–8.

Harris, R B and Ioannou, P G (1998) Scheduling Projects with Repeating Activities. Journal of Construction Engineering and Management, 124(04), 269–78.

LeBlond, D, Owen, F, Gibson, G E, Haas, C T and Traver, A E (1998) Control Improvement for Advanced Construction Equipment. Journal of Construction Engineering and Management, 124(04), 289–96.

Moon, S and Bernold, L E (1998) Graphic-Based Human-Machine Interface for Construction Manipulator Control. Journal of Construction Engineering and Management, 124(04), 305–11.

Tabatabai-Gargari, M and Elzarka, H M (1998) Integrated CAD/KBS Approach for Automating Preconstruction Activities. Journal of Construction Engineering and Management, 124(04), 257–62.

Tommelein, I D (1998) Pull-Driven Scheduling for Pipe-Spool Installation: Simulation of Lean Construction Technique. Journal of Construction Engineering and Management, 124(04), 279–88.

Toole, T M (1998) Uncertainty and Home Builders' Adoption of Technological Innovations. Journal of Construction Engineering and Management, 124(04), 323–32.

Wang, S Q, Tiong, R L K, Ting, S K, Chew, D and Ashley, D (1998) Evaluation and Competitive Tendering of BOT Power Plant Project in China. Journal of Construction Engineering and Management, 124(04), 333–41.